Search results for '277 240'
-
150 kVA 240 Volt to 550Y/318 Volt Three phase Epoxy Encapsulated Transformer BC150C-Q2/EP
NOT in stock. Current lead time to manufacture: 9-10 weeksUS$ 47,018.00Catalog No.: BC150C-Q2/EP
See Full Specification | Add to Compare
Epoxy Encapsulated Transformer 150 kVA • Three Phase • Primary: 240 Volt • Secondary: 550Y/318 Volt
Conductor: Copper. • Frequency 60 Hz. -
150 kVA 240 Volt to 575Y/332 Volt Three phase Epoxy Encapsulated Transformer BC150C-Q1/EP
NOT in stock. Current lead time to manufacture: 9-10 weeksUS$ 47,466.00Catalog No.: BC150C-Q1/EP
See Full Specification | Add to Compare
Epoxy Encapsulated Transformer 150 kVA • Three Phase • Primary: 240 Volt • Secondary: 575Y/332 Volt
Conductor: Copper. • Frequency 60 Hz.

United States


